The sale agreement is signed, the keys change hands on the first of the month, and the shop reopens the next day with the same benches, the same mechanics and the same telephone number. Three weeks later, a customer refuses a release: the certificate accompanying the component quotes the reference of an approval that no longer covers the legal entity which signed it. This is not a clerical mishap, it is the direct consequence of a stubborn misconception — believing that a maintenance approval forms part of the assets being sold. It does not, and what a change of ownership reopens deserves to be known before signature, not after.
An approval is not an asset, it is the record of a demonstration
A maintenance organisation approval is issued to a named legal entity, for a described scope, after a team of inspectors has verified on site that this organisation had the facilities, the tooling, the data, the procedures and the people required for the work applied for. What the certificate attests is not the value of a shop: it is the outcome of a demonstration, made on a given date, by an identified holder. Such a record is no more transferable than a degree is resold along with the practice.
The confusion comes from the vocabulary of acquisitions, which readily files the approval among the “administrative authorisations” in the perimeter, somewhere between the lease and the liability insurance. The difference is that the certificate rests on individually accepted people and on an exposition manual which describes a specific organisation. Remove the accountable manager, change the budget decision chain, transfer the stores to a sister company, and the document no longer describes anything real.
That manual is in fact the entry point of the review. It names the accountable manager and the nominated persons, describes the facilities, the organisation chart, the incoming inspection procedure, the release procedure and the change management procedure. A change of ownership almost always touches its opening chapters, and often much further: subcontracting, the pooling of a stores facility, the attachment of compliance monitoring to a group function.
The approval is not a physical asset like tools or buildings. It’s a legal document proving that a specific company meets certain standards. If the company changes owners, the approval must be reviewed because the new owners may have different people, procedures, or financial controls.
A shop specializing in A320 landing gear maintenance is sold. The new owner keeps the same mechanics and tools, but moves the stores to a sister company. During the next audit, the authority finds that the approval no longer matches reality because the stores are now controlled by a different legal entity, invalidating the approval.
Share purchase or asset purchase: the legal form dictates the timetable
In a share purchase, the legal entity survives the transaction. The certificate remains its own, with its reference, its specifications and its history. Nothing lapses automatically — but a change of control is a change, and it falls within the change management procedure of the manual. The authority then verifies that the accountable manager retains real authority to commit resources, that the nominated persons remain in post and available, and that the organisation described in the manual still matches the one the new shareholder is putting in place.
In an asset purchase, there is no transfer: there is a new applicant. The acquiring company enjoys no history, no audit deferral, no leniency arising from the sameness of the premises or the teams. It files a complete application, goes through the assessment, the on-site audit, the closure of findings, and receives a brand-new certificate. That process is counted in months, and the countdown starts not at the signature of the agreement but at the filing of an admissible application.
Hence the arrangement that works: incorporate the acquiring entity very early, file the application while the seller is still operating, be audited in the same premises under a facility-provision agreement, then make the issue of the new certificate and the surrender of the old one fall on the same date. This is not legal elegance, it is the only way to avoid an interruption in release capability.
| Item | Share purchase | Asset purchase |
|---|---|---|
| Holder of the approval | Unchanged, the legal entity survives | New legal entity, new application |
| Certificate reference | Retained | New, to be reflected in every contract |
| Exposition manual | Amended (shareholding, delegations) | Rewritten and assessed in full |
| Nominated persons | Retained, subject to review | Accepted afresh, one by one |
| Release authorisations | Continued | Lapsed, to be reissued |
| Capability list | Carried over, supports to be rechecked | Rebuilt item by item |
| Maintenance data licences | Change-of-control clause to be cleared | Contracts to be taken out in the new name |
| Work records | Stay with the holder | Stay with the seller, unless stipulated |
The gap between two certificates cannot be made up. No transitional arrangement allows work to be released under an approval that is no longer yours, or under an approval not yet issued. A shop that closes on Friday under one legal entity and reopens on Monday under another, with no certificate in force, can pronounce nothing: the work stays open, the aircraft grounded at the customer’s, and any certificate issued in the meantime is devoid of value. The harm is not administrative, it is operational and is counted in days out of service.
The accountable manager: the authority looks at the power to spend
The function of accountable manager is not honorary. It presupposes the authority to commit the company so that all the work is funded and carried out to the required standard, and it is precisely that authority which the oversight authority verifies when the shareholding changes. A buyer who installs group-level financial control, with a low commitment threshold and remote validation, empties the function of its substance while keeping the same name in the manual. The day a test bench calibration is not renewed for want of a budget decision, the mechanism has been demonstrated.
Nominated persons are subject to individual acceptance, granted on the basis of a file and, most often, after an interview. Sharing one compliance monitoring manager across three sites of the same group is not prohibited, but it has to be demonstrated: genuine availability, independence from production, knowledge of the site and of its work. An appointment that rests on nothing but a holding company organisation chart falls at the first question asked on the shop floor.
The trap is a quiet one: the same names appear in the manual, nobody declares a change, but the schedule of delegated powers has been rewritten by the buyer’s advisers, and the accountable manager no longer has a hand in investment. The manual then describes an organisation that no longer exists, which is exactly the definition of a systemic finding.
Take the delegation matrix to the pre-application meeting, not the sale agreement. What the authority wants to read fits on one page: who signs off a tooling investment, who decides to hire a certifying staff member, who can stop production. If those three lines run above the accountable manager, correct them before signature — afterwards, they get corrected under a finding.
The capability list: four supports, no compensation
The capability list states what the shop is able to do, item by item, and it is the document people most readily believe to be portable. Yet every line rests on four simultaneous supports: approved maintenance data, current and accessible under a valid licence; available, calibrated tooling with its traceability chain; staff trained on that specific item and assessed; premises, benches and an environment that suit. The organisation carries out a self-evaluation before adding an item, and the authority probes the list by sampling.
The sale moves those supports in ways no valuation anticipates. Specific tooling sometimes belongs to a sister company of the seller and stays with it. The calibration contract is taken out in the name of the former legal entity and expires with it. Two technicians who alone carried three lines of the list choose not to follow. The lease on the room housing a climatic test bench is not taken over. Nothing has moved in the shop, and yet half the lines are no longer demonstrable.
The professional answer is not to keep a flattering list long enough to reassure customers. It is to reduce the scope voluntarily, then rebuild it line by line as the supports are restored. A capability advertised but not demonstrable is the easiest finding to raise during a visit, and the hardest to explain to a customer who entrusted a component on the strength of that line.
Manufacturer data licences do not follow the buyer. Subscriptions to component maintenance manuals, parts catalogues and service bulletins are contracts in a specific name, frequently carrying a change-of-control clause. An acquisition, even of shares, can therefore suspend access to the data on the day it is announced, and without approved data the corresponding capability no longer exists — even if the files remain readable on the shop workstation. That clause is cleared during the negotiation, not afterwards.
Certifying staff: the authorisation belongs to the organisation
The authorisation to issue a release is granted by the organisation, within the limits of its own scope, to a person who holds the required licence or qualification, has completed the required training, has the corresponding experience and whose competence has been assessed. It is not an attribute of the person: it ceases with the organisation that issued it. A seasoned certifying staff member who changes employer keeps nothing of the signature, only what justified it.
In an asset purchase, all authorisations therefore lapse on the changeover date and must be reissued by the buyer. That presupposes holding the individual files: initial and continuation training, competence assessments, experience logs, the exact scope of each authorisation, any limitations. Yet those files belong to the system of the former organisation, and having them handed over is a contractual clause, not a given. Without them, everything has to be reconstituted, and a shop can find itself with qualified mechanics it cannot authorise.
Experience, for its part, stays with the person. The recent-experience requirement — a volume of relevant activity to be evidenced over a rolling window, coupled with continuation training at regular intervals — is not reset because the sign over the door has changed, but neither does it accumulate indefinitely: whatever falls out of the window stops counting, and a takeover that brings a shop to a standstill for a few months erodes that capital without anyone declaring it. It still has to be provable, which brings us back to the same file. For the certifying staff member, the check is personal: signing under a lapsed or out-of-scope authorisation is not a departmental oversight, it engages that person directly.
Stock, archives and what has already been released
The release certificate travels with the part, but acceptance into stores is an act of the organisation that runs those stores. Every part number taken over must therefore go back through the buyer’s incoming inspection: conformity with the order, an acceptable and consistent release document, physical condition, shelf-life and storage limits, conditions of preservation. Whatever fails the step goes into quarantine, and whatever cannot come back out of it goes to scrap. Stock carried on the balance sheet at its purchase price can prove very largely uninstallable.
Consumables and materials pose the same problem in another form: batches, use-by dates, conditions of preservation, linkage to the original certificate. A tidy shelf is no substitute for a record, and a raw material whose batch can no longer be traced cannot be rescued by any visual inspection.
Work records, for their part, must be kept for several years after release — the required duration depends on the applicable regime and is longer for certain life-limited items. In an asset purchase they stay with the seller, who may be wound up in the months following the sale. Provision must therefore be made in the contract for a copy and an undertaking to make them available, failing which a customer asking for the file on a two-year-old repair will come up against a company that no longer exists.
As for liability, it does not move: whatever was released under the old certificate remains attached to the old organisation. The buyer does, on the other hand, inherit the customers, who will audit the new supplier and whose internal approved-vendor listing is not automatic.
Set up a technical data room, separate from the financial data room. It holds seven items: the exposition manual in force with its amendment history, the capability list and the self-evaluations supporting it, the tooling inventory with owner and calibration certificates, the data licence contracts and their change-of-control clauses, the individual files of the certifying staff, the state of the stock with its release documents, and the open findings with their action plans. Whatever is missing from that list will be missing for the authority too.
What to check before signing, and the grey area that remains
On the buyer’s side, the order of the checks matters more than their number. First read the change management procedure of the manual being sold: it says which changes require prior approval and which are merely declared. Then request a pre-application meeting with the authority, presenting the intended arrangement and its changeover date — a forewarned authority assesses, an authority that discovers the deal in the trade press investigates. Finally map the contracts that carry a change-of-control clause: maintenance data, calibration, hire of specific tooling, subcontracting of surface treatments or non-destructive testing.

| Subject of the review | What the authority looks at | Expected handling |
|---|---|---|
| Shareholding and control | Who really decides the shop’s budget | Change declared, often approved before taking effect |
| Accountable manager | Effective authority to commit resources | Acceptance confirmed, written delegations up to date |
| Nominated persons | Availability and competence, site by site | Acceptance interview, manual amended |
| Location and facilities | Floor areas, environment, storage conditions | Prior approval in the event of a move |
| Scope of approval | Capabilities actually demonstrable | Voluntary reduction rather than a fictitious line |
| Subcontracting | Control of the chain of providers | List kept in the manual, supplier audits up to date |
On the certifying staff side, the check is individual and is made from the first day of operation under the new sign. Three points are checked before any signature: the authorisation has been reissued in the name of the new legal entity, its scope does cover the item presented in the shop, and the manual amendment in force is the one on which the certifying staff member has been briefed. That check takes a few minutes and avoids a signature that would bind no one but its author. Experience from recent takeovers is usefully shared on the FL330 forums, where practitioners describe what sale files never say.
A grey area remains, that of the perimeter of the “organisation” within a group. How far does a shared compliance monitoring function remain independent? Does a multi-site approval absorb the shop that has been bought, or does that shop keep its own certificate until integration has been demonstrated? Recognitions arising from bilateral agreements moreover follow their own timetable, independent of that of the issuing authority, and approved-vendor listing at each customer obeys yet a third rhythm: an operator may perfectly well suspend its shipments while it re-audits a supplier whose approval is nonetheless in order. For anyone preparing for a management role or considering a takeover support assignment, it is this triple timetable — authority, recognition, customer — that structures the transition plan, and the technical assignment listings reflect fairly faithfully the skills that such transactions put in demand.
This article describes general mechanisms and replaces no official source. The text applicable in the State of issue, the particular conditions attached to the certificate, the approved documentation of the organisation and the decisions of the competent authority prevail over what is written here.
Questions fréquentes
Can a maintenance approval appear in the asset perimeter of a sale?
No. The certificate is issued to a named legal entity after demonstration of its capability, and it is not transferable like a piece of property. It may well appear in an inventory list drawn up by advisers unfamiliar with the sector, but that mention has no effect: if the holding legal entity disappears from the arrangement, the certificate disappears with it and the buyer has to file its own application.
In a share purchase, must the authority be informed if nothing changes in the shop?
Yes, because something has changed: control of the company. The change of shareholding falls within the change management procedure of the exposition manual, and it entails at the very least a declaration, often an approval before it takes effect where it touches the accountable manager or the financial delegations. Saying nothing exposes the organisation to a systemic finding at the next visit, even though production is beyond reproach.
Do certifying staff authorisations survive the sale?
The answer depends on the form of the transaction. In a share purchase the issuing organisation survives and the authorisations continue, subject to the conditions underpinning them being maintained — licence or qualification, training, recent experience, competence assessment. In an asset purchase they lapse on the changeover date and must be reissued by the new organisation. Having failed to negotiate the handover of the individual files, a buyer finds itself with qualified mechanics it is in no position to authorise.
What becomes of a line in the capability list if the specific tooling stays with the seller?
It falls. A capability rests on four simultaneous supports — approved data, calibrated tooling, trained staff, suitable premises — and the absence of a single one is enough to make it non-demonstrable. The correct conduct is to withdraw the line from the advertised scope and to restore it once the tooling has been bought or hired, with its calibration chain, rather than keeping it and betting on the authority’s sampling.
Who keeps the work records after the sale?
The organisation that issued the release remains responsible for keeping them for the required period, of the order of several years. In an asset purchase those records therefore stay with the seller, who may be wound up shortly after the transaction. The contract must provide for the handover of a complete copy and an undertaking to make them available, without which the buyer will be unable to answer a customer asking for the file on an earlier repair.
Does the customer have to redo its supplier approval after the takeover?
In practice, yes as soon as the legal entity changes, because listing a maintenance supplier is an act specific to the contracting party, distinct from the issue of the certificate. Even in a share purchase, many operators trigger a supplier audit on the grounds of the change of control. It is prudent to anticipate those audits in the transition plan and to warn customers before the changeover date rather than after.

Leave a Reply
You must be logged in to post a comment.