-

Contract pilot after an occurrence: where the operator’s cover stops
A serious incident, a flight cut short, a crew taken off the roster that same evening. Three days later, the operator issues…
-

Just culture: what a single reaction from management can undo in a week
A first officer files a voluntary report on a poorly managed descent that he himself caused. A few days later, a line…
-

Buffet Boundary: Reading the Narrow High-Altitude Envelope
A clearance offers one more level, the weight permits it on paper, and the recommended maximum altitude shown on board falls exactly…
-

Tier 1 and Tier 2: where technical responsibility goes when the subcontractor subcontracts
A fitting cracks on several aircraft of the same fleet. The investigation traces the cause back to a heat-treatment batch processed by…
-

Reporting under a wet lease: who reports what, and to which authority
A high-speed rejected take-off on a wet-leased aircraft, a return to stand, a brake inspection. The lessee’s operations control centre learns of…
-

Assignment terminated overnight: the contractor’s real remedies
The message arrives on a Tuesday evening: next week’s rotation is cancelled, the assignment ends there, thank you for the work done.…
-

Dry cabin air: separating what humidity causes from what workload causes
End of a night sector, final cabin check: the throat rasps, the eyes sting under contact lenses, the head feels heavy and…
-

Energy Management on Approach: What Automation Conceals
Three miles from the threshold, the flight director bars are centred, the glidepath is held to within half a dot, and yet…
-

Ground Effect: Why the Flare Does Not Fly Like an Altitude Pull-Up
The approach was stabilized, the height call came, the pitch attitude was set as it had been a thousand times before —…
